HOME
ABOUT
OUR SERVICES
BLOG
RECRUITMENT
CASES
MESSAGE
CONTACT
Company News
Industry Trends
Practical Tools
FMW "Tiger" project goods successfully completed
In June of this year, our company signed a cooperation agency intention with the Austrian company FMW. FMW entrusted all goods of its "Tiger" project from Nantong to Beihai to our company for transportation arrangements. The goods in this project are conveyors, and they need to undergo a one-day tour business in the bonded area, with door-to-door full transportation. A total of 10 shipments were made for this project, including 8 shipments from Nantong, 1 shipment from Shanghai, and 1 shipment from Qingdao, totaling 57*40HC and 3 truckloads of bulk cargo. By September 30, all deliveries for this project had been completed, and our work received high praise from FMW.
15
2015
/
10
Mv.GOLD EAGLE (Golden Eagle) wheel loaded for departure at Yantai Container Terminal.
From October 2 to 4, 2015, the bulk carrier Jin Ying "Mv" represented by our company arrived at Yantai Port for equipment loading operations. With our company's years of business experience, the vessel successfully loaded cargo and departed on the 4th with a total of 453 pieces of cargo, weighing 1703.554 tons and measuring 5538.2 cubic meters.
14
This year, travel to Taiwan!
In August, the Taiwan trip for all employees and their families was successfully concluded. During this trip, everyone deeply felt the warmth of the Xinyun family, and we will all invest ourselves in our work with even greater enthusiasm. Let us collectively wish for a brighter future for our big family!
09
Transportation of large cargo from Yantai to Binzhou
Product Name: Reactor Length: 10.77 meters Diameter: 3.85 meters Height: 4.35 meters Weight: 38 tons Starting Point: Yantai Port Destination: Binzhou Transported by a special vehicle with a chassis height of 40 centimeters.
22
07
The American imported blowout preventer has successfully arrived at Raffles.
Product Name: Blowout Preventer Group Specification: Total Weight: 288 tons Total Volume: 403.24/m3 Starting Point: Yantai Port Destination: Yantai CIMC Raffles Shipyard Work Description: A Singaporean cargo ship docked at Yantai Port, equipment was transferred from the cargo ship to the barge "Zhedai 66388", and successfully unloaded at CIMC Raffles Shipyard.
The large cargo transportation project of Yantai Guojie Metallurgical Water Cooling Equipment Co., Ltd. has been successfully completed.
The Yantai Guojie Metallurgical Water Cooling Equipment Co., Ltd. large cargo transportation project consists of 14 items weighing approximately 90 tons, with a volume of 300 cubic meters. The dimensions of the three large items are as follows: (Diameter * Width * Height) 7.6m * 6.8m * 2.45m, weighing 19 tons; 7.5m * 6.5m * 1.85m, weighing 21.4 tons; 6.8m * 6.25m * 4.45m, weighing 21 tons. This shipment was loaded onto the ship at Yantai Port on the evening of June 30, 2015, and safely arrived at Shanghai Baosteel Terminal on July 5.
The first voyage of the FMW Tiger project was successfully completed.
The Tiger project is the first business collaboration between our company and the Austrian FMW company, with a total cargo volume of approximately 60*40HC, 700T, 4000CBM. This project started loading the first voyage of 10*40HC on June 2, 2015, and then conducted a one-day tour business in the Nantong bonded area. The goods were shipped to Beihai, Guangxi on June 11 and were completely unloaded at the receiving factory by July 2. Thus, the first voyage of the Tiger project was successfully completed, and the work was recognized by the owner. The operation of this project has also laid a foundation for our company to develop more business in Nantong.
06
The pilot is concerned about the development of the enterprise, and the enterprise and port navigation create prosperity together.
At the beginning of May, the COSL platform successfully set sail. Our company today delivered a banner to the Yantai pilot station to express our gratitude. The pilot station provided us with great assistance during the COSL departure process, and we hope for better cooperation in the future.
02