Blog

The Ecuador wind power project has been successfully completed.

  In November 2021, our company was entrusted by a client to transport 14 sets of wind power equipment to Ecuador, which included 56 tower sections, 42 blades, 14 generator hub cabins, and several other pieces of equipment, with a total volume of 80,000 cubic meters. Among them, the tower sections are up to 28.8 meters long, the blades are 72.5 meters long, and the generator weighs 100 tons. The Tai Xing vessel, which loaded the wind power equipment, is the largest heavy-lift ship in the world, with a deadweight of 60,000 tons.
  With our company's professional loading plan and the coordination of various equipment and vehicles, the 80,000 cubic meters of equipment was loaded in extremely harsh snowy weather, completing the entire loading task in 7 days. During the operation, our professional service level and high-quality service received high praise from the client. The successful loading at the port has opened a win-win model between our company and COSCO, which will help expand the scope of business cooperation in the future and play a positive role in promoting long-term cooperation between both parties.


 

Recommend Blog

Company News

Industry Trends