The unloading agency work for the "Bai An Hai" ship has been successfully completed.
Sending off the "Spring Breeze," the "Bai An Hai" has arrived. After the successful completion of the agency work for the "Spring Breeze" vessel, the shipping agency department of Xinyun Company accepted the commission from COSCO Bulk Shipping Co., Ltd. to carry out the unloading agency work for the "Bai An Hai" vessel. The "Bai An Hai" is 292 meters long, 45 meters wide, and has a draft of 18.4 meters, carrying over 175,000 tons of iron ore from Singapore. The unloading was completed at 8:20 AM on May 5 and the vessel departed at 10:40 AM on May 7, taking a total of two days, unloading 70,000 tons in Yantai. In the preliminary communication, due to the deep draft of the vessel, the anchorage position is also.
Classification: Company News
Sending off the "Spring Breeze," the "Bai An Hai" has arrived. After the successful completion of the agency work for the "Spring Breeze" vessel, the shipping agency department of Xinyun Company accepted the commission from COSCO Bulk Shipping Co., Ltd. to carry out the unloading agency work for the "Bai An Hai" vessel.
The "Bai An Hai" vessel is 292 meters long, 45 meters wide, and has a draft of 18.4 meters, carrying over 175,000 tons of iron ore from Singapore. The unloading was completed from 8:20 AM on May 5 to 10:40 AM on May 7, taking a total of two days, with 70,000 tons unloaded in Yantai.
In the preliminary communication, due to the deep draft of the vessel, the anchorage position was also a crucial issue that needed to be confirmed in advance. After communicating with the pilot station, dispatch office, and other departments, the anchorage position was changed to ensure the vessel's draft. Before the vessel arrived at the port, our internal and external staff had already prepared the necessary materials for import and export, including the four-level approval, berthing application, solid bulk cargo declaration, and vessel tonnage tax application. Once the vessel arrived, our staff immediately began handling the procedures after the vessel's arrival at the port, ensuring the smooth unloading of the "Bai An Hai" vessel.
After two days and nights of hard work unloading and close cooperation between internal and external staff, the vessel successfully departed, meeting the owner's time requirements, and the agency work was completed satisfactorily.
Recommend Blog
Company News
-
The "Xiangyun Kou" wheel successfully floated and unloaded the "Zhaoshang Hailong 7" platform.
2024-10-30
-
Hua Hai Long Lun Floating Installation "RAWABI 608" and "RAWABI 609" Platform Project
2024-10-11
-
Wind Power Installation Vessel H606 Offshore Transportation
2024-07-24
-
Xiang'an Kouwen Weihai Floating Installation Zamil LB9 Platform Project
2024-05-07
-
Yantai Xinyun Logistics Supports Wind Power Transportation: H582 Wind Power Installation Vessel Successfully Arrives in Yantai
2024-04-28
Industry Trends
-
The German ZEABORN Group announces the acquisition of Rickmers Reederei | Shipping Industry
2017-02-13
-
There are new changes in the direct return of imported goods!
2017-02-13
-
Maersk Shipping, Mediterranean Shipping, and Modern Container Shipping have reached a strategic cooperation agreement.
2016-12-14
-
Announcement by the Customs on the Implementation of Adjusting the Most-Favored-Nation Tax Rate for Certain Imported Information Technology Products
2016-12-12
-
Announcement on Adjusting the Most-Favored-Nation Tax Rate Related to Certain Imported Information Technology Products
2016-11-03
Practical Tools
-
Comparison of World Port Names in Chinese and English
2015-10-31
-
Shipping company names in Chinese and English, and their abbreviations
2015-10-31
-
Common English for Freight Forwarding
2015-10-31
-
Airline names in Chinese and English, along with their codes
2015-10-31
-
Container Size Comparison
2015-10-31